Santa Rosa County has posted the third-quarter report of the half-cent local option sales tax projects to the county website. A map story has been created to illustrate project location and details. FY17 completed projects include: Transportation and Drainage
Woodbine Road Resurfacing – $348,954Allentown Road Widening and Resurfacing – $606,815Settlers Colony Drainage Design (using leveraged funds) – $211,230
Public Safety
Emergency Communication Radio Site – $558,722Emergency Communication System – $809,011Firefighter Association Request – $194,750Portable radios for Berrydale and MidwayThermal imaging cameras for Berrydale and PaceAir compressor for refilling SCBA tanks for AllentownJAWS of Life unit for JayTen self-contained breathing apparatus bottles for Bagdad
FY17 projects in process include: Transportation and Drainage
Sweet Bay Bridge Construction – $250,000Hamilton Bridge Road Sidewalk (using leveraged funds) – $90,000Edgewood Drive Resurfacing – $1,080,000
Recreation and Natural Resources
Floridatown Park Improvements (using leveraged funds) – $125,119Optimist Park Improvements – $230,000Chumuckla Park Improvements – $150,000Navarre Sports Complex Lights – $124,500Tiger Point Park Lights – $124,500
Public Safety
Harold Fire Department Building Modification
A link for comments is also available on the site.
For information on revenues, expenditures and a complete list of the FY 2018 projects, visit www.santarosa.fl.gov/capitalprojects.
This article originally appeared on Santa Rosa Press Gazette: Local Option Sales Tax Report available