Escambia and Santa Rosa County traffic changes

Drivers will encounter traffic disruptions on the following state roads in Escambia and Santa Rosa counties as crews perform construction and maintenance activities.

ESCAMBIA COUNTY 

State Road (S.R.) 742 (Creighton Road) Construction Improvement Project from east of Davis Highway to Scenic Highway –Drivers traveling Creighton Road will encounter traffic pattern changes:

Creighton Road (Davis Highway to Scenic Highway): Intermittent and alternating lane closures between Davis Highway and Scenic Highway from 8:30 p.m. to 5:30 a.m. through Saturday, Jan. 20 continue as crews perform milling, paving, sidewalk and curb replacement.

U.S. 29 Resurfacing between U.S. 90 and Muscogee Road – Alternating lane closures on U.S. 29 north and southbound, from Muscogee Road to West 9 ½ Mile Road, from 8 p.m. to 6 a.m. through Saturday, Jan. 27 as crews pave the roadway.

Interstate 10 (I-10) / U.S. 29 Interchange Improvements Phase I – The following traffic impacts are planned on I-10 and U.S. 29 near the interchange (Exits 10A and 10B) from 8 p.m. to 6 a.m. through Thursday, Jan. 18:

Alternating lane closures on I-10 east and westbound and U.S. 29 north and southbound.

The U.S. 29 on-ramps to I-10 eastbound will be intermittently closed. Traffic will be detoured on U.S. 29 to access I-10 eastbound.

The exit ramp from I-10 westbound to U.S. 29 south (Exit 10A) will be intermittently closed. Traffic will be detoured to U.S. 29 north (Exit 10B).

Alternating lane closures on the I-10 westbound exit ramp to U.S. 29 north (Exit 10B).

I-10 Widening from Davis Highway to the Escambia Bay Bridge – Intermittent alternating lane closures on I-10, between Davis Highway (Exit 13) and Scenic Highway (Exit 17), and on Scenic Highway, between Whisper Way and Northpointe Parkway, from 7 p.m. to 6:30 a.m. through Thursday, Jan. 18 as crews perform construction activities. The speed limit on I-10 will be reduced to 60 mph during nighttime lane closures.

U.S. 29 Widening from I-10 to Nine Mile Road – Drivers traveling U.S. 29 and Nine Mile Road will encounter traffic pattern changes from 8 p.m. to 6 p.m. through Saturday, Jan. 20 as follows:

Nine Mile Road at the U.S. 29 overpass: Eastbound traffic will be shifted to the westbound inside travel lane nightly as crews prepare the area for construction of the support column for the new center bridge deck. Lane restrictions are Sundays through Thursdays.

U.S. 29 between I-10 and 9 1/2 Mile Road: Drivers may experience alternating lane closures as crews perform drainage operations.

S.R. 4 at Escambia River Bridge- Intermittent lane restrictions from 9 a.m. to 3 p.m. Friday, Jan. 19 as crews remove drift from underneath the bridge.

SANTA ROSA COUNTY 

I-10 Widening from Escambia Bay Bridge to Avalon Boulevard (S.R. 281/Exit 22) – Alternating lane closures on I-10, from the Escambia Bay Bridge to east of S.R. 281 (Avalon Boulevard/Exit 22), from 8 p.m. to 6 a.m. Tuesday, Jan. 16 through Friday, Jan. 19 as crews work to widen the roadway. In addition, alternating lane closures on Avalon Boulevard, near the I-10 interchange, as crews reconstruct the overpass.

U.S. 90 Pavement Marking Operations between Shadow Oak Lane and Spears Street in Pace- The westbound outside, right lane of U.S. 90 between Shadow Oak Lane and Spears Street in Pace will be closed from 8 p.m. Tuesday, Jan. 16 to 5 a.m. Wednesday, Jan. 17 as crews install pavement marking in a new right turn lane. 

S.R. 87 Multilane from Eglin AFB boundary to Hickory Hammock Road – Traffic between County Road 184 (Hickory Hammock Road) and the Eglin AFB boundary is restricted to loads less than 11-feet wide. The restriction will be in place until the project is complete.

This article originally appeared on Santa Rosa Press Gazette: Escambia and Santa Rosa County traffic changes