MILTON — Drivers will encounter traffic disruptions on these state roads in Escambia and Santa Rosa counties as crews perform construction and maintenance activities.
Escambia County:
●Interstate 10 widening — intermittent and alternating lane closures, between State Road 291 (Davis Highway/Exit 13) and U.S. 90 (Scenic Highway/Exit 17), from 7 p.m. to 6:30 a.m., the week of Monday, April 4.
●I-10/U.S. 29 Interchange improvements — The outside lane of I-10 eastbound near U.S. 29 (Exits 10A and 10B) will be closed Sunday, April 3 and Monday, April 4 from 8 p.m. to 6 a.m. as crews install barrier wall.
Santa Rosa County:
●U.S. 98, Santa Rosa County — alternating lane closures, between Central Parkway and the Gulf Breeze Zoo, from 7 p.m. to 7 a.m. Sunday, April 3 through Thursday, April 7 as crews perform work list items.
●Marquis Bayou Bridge, Santa Rosa County — alternating lane closures on U.S. 90 on the Marquis Bayou Bridge Saturday, April 2 from 7:30 a.m. to 4 p.m. as crews pressure wash the bridge.
●I-10 widening, Santa Rosa County — alternating lane closures on I-10, between the Escambia Bay Bridge and S.R. 281 (Avalon Boulevard/Exit 22), from 8 p.m. to 6 a.m. Sunday, April 3 through Thursday, April 7 as crews place barrier wall.
●In addition, alternating lane closures on Avalon Boulevard near the I-10 interchange during this time as crews perform bridge work.
This article originally appeared on Santa Rosa Press Gazette: 6 traffic changes to expect in Santa Rosa County